| 01 |
Heritage Energy Operational Services Ltd |
Front End Design Engineering (FEED) Update For The Continous Horizontal Directional Drilling (HDD) Of The Trans Forcados Pipeline |
Ongoing |
| 02 |
Heritage Energy Operational Services Ltd |
Olomoro Utility Underground Survey Project |
Ongoing |
| 03 |
Enageed Resources Limited |
Conceptual, FEED & Detailed Engineering Design For A 10- Inch X 37.5 km Oki-Oziengbe To Amukpe Flowstation Export Pipeline Using Hybrid (HDD & Open Cut) Drilling Method |
Ongoing |
| 04 |
Stratos Trading |
EPCIC of 2 Nos. 2.1 km Pipeline Project |
Ongoing |
| 05 |
Newcross Exploration & Production Limited |
Detailed Engineering Design for 15 MMSCFD AWOBA Flareout Project |
Ongoing |
| 06 |
HEIRS Energies/PESO Energy Limited |
Detailed Engineering Design for Alternative Gas Manifold Modification Work
|
Ongoing |
| 07 |
AKARD/Heritage Energies |
Detailed Engineering Design for Ugheli Pump Station Exit Lact Unit
|
Ongoing |
| 08 |
ALKANES Engineering Limited |
Ekpe Vulnerable Piping Replacement Project
|
Completed |
| 09 |
Newcross Exploration & Production Limited |
Feasibility Studies, Concept Selection, Front-End Engineering Designs for A 250 MMSCFD Non-Associated Gas (NAG) Plant with Full Fractionation Unit in AWOBA (OML 24) |
Completed |
| 10 |
Marie Tecnimont (Port Harcourt Refinery) |
Design, Procurement and Supply of Miscellaneous Parts of Air Coolers for Area 1 And Area 2 |
Completed |
| 11 |
PESO Energy Limited |
Detailed Engineering Design for the Modification of Regeneration Gas line for Ovade Gas processing Plant |
Completed |
| 12 |
Stratus Trading Limited |
Detailed Engineering Design for Bunker Facility (Tank Farm) and Associated Pipelines Project |
Completed |
| 13 |
PESO / Enageed Resources Limited |
Conceptual Studies, FEED, and DED for Retrofitting Installation of Thermal Heater Treater OML 148 (Oki Ozengbe Processing facility) |
Completed |
| 14 |
Newcross Exploration & Production Limited |
FEED for Revamp of 55MMscfd AG Compression Facility |
Completed |
| 15 |
CMA CGM |
Feasibility studies and FEED for a 12 MW photovoltaic plant at Lekki Deep Sea Port |
Completed |
| 16 |
PESO / NNPC Exploration & Production Limited (NEPL) |
OML 111 Feasibility Studies and FEED for flow flexibility |
Completed |
| 17 |
PESO / NNPC Exploration & Production Limited (NEPL) |
Feasibility Studies for OML 65 Facilities Optimization |
Completed |
| 18 |
Stratus Trading Limited |
Detailed Engineering Design for Bunker Facility (Tank Farm) and Associated Pipelines Project |
Completed |
| 19 |
PESO Energy Limited / Newcross E&P |
Engineering Design For The Installation for Inlet Coalescer Filter (F-100) |
Completed |
| 20 |
Lekki freeport Terminal |
EPC for Installation of Metering Skid for Underground Storage Tanks |
Completed |
| 21 |
Marie Tecnimont (Port Harcourt Refinery) |
Design, Fabrication and Supply of 16 No. Orifice Plates for Area 5 |
Completed |
| 22 |
Marie Tecnimont (Port Harcourt Refinery) |
Supply of Stainless Steel Wool |
Completed |
| 23 |
Platform Petroleum Limited |
Procurement and Delivery of Valves and Ariel Flares |
Completed |
| 24 |
PESO / Greenville LNG Ltd |
Interface Engineering Design for Nitrogen Plant for Greenville LNG. |
Completed |
| 25 |
Platform Petroleum Limited |
Supply & Delivery of Production Operations Material Spares |
Completed |
| 26 |
PESO Energy Limited / SALBERG Infrastructure |
Cost Engineering Services for 430KM Alpha 1 Gas Pipeline Project |
Completed |
| 27 |
Lekki freeport Terminal |
EPC for the Modification of Fuel Boswer Supply Lines |
Completed |
| 28 |
TSL Logistics Nigeria Limited |
Product Storage Tanks Infrastructure Development Studies for Mali and Senegal Project |
Completed |
| 29 |
NAOC/ Sendwaive Energy Limited |
EPC for Instrumentation Works for KGP Upgrade Project |
Completed |
| 30 |
BOKAR Engineering Limited |
EPC, Feasibility Studies for Gas Commercialization—Ammonia plant |
Completed |
| 31 |
Newcross Exploration & Production Limited |
Conceptual studies for the 14”X 25km Ekulama – Awoba pipeline project |
Completed |
| 32 |
Newcross Exploration & Production Limited |
Third Party Assessment—Ekulama Booster Compressor Replacement Project |
Completed |
| 33 |
SICCI SALDO Contracting Nigeria Limited |
Ekulama—Awoba Pipeline Route Corridor Assessment Studies |
Completed |