| 1 |
CMA CGM |
Feasibility studies and FEED for a 12MW Photovoltaic Plant at Lekki Deep Sea Port |
Ongoing |
| 2 |
Newcross Exploration & Production Limited |
Feasibility Studies, Concept Selection, Front-End Engineering Designs For A 250 MMSCFD Non-Associated Gas (NAG) + LPG Plant and Ancillary Facilities in Awoba (OML 24) |
Ongoing |
| 3 |
Newcross Exploration & Production Limited |
FEED for Revamp of 55MMscfd AG Compression Facility |
Ongoing |
| 4 |
Newcross Exploration & Production Limited |
FEED for Integration of a new 15MMSCFD compression package to Awoba Gas Facilities |
Ongoing |
| 5 |
Stratus Trading Limited |
Detailed Engineering Design for Bunker Facility (Tank Farm) and Associated Pipelines Project |
Completed |
| 6 |
Newcross Exploration & Production Limited |
Conceptual studies for the 14”X 25km Ekulama – Awoba pipeline project |
Completed |
| 7 |
Newcross Exploration & Production Limited |
Third Party Assessment – Ekulama Booster Compressior Replacement Project |
Completed |
| 8 |
Marie Tecnimont |
Procurement and Supply of Miscellaneous Parts of Air Coolers for Area 1 And Area 2 for Portharcourt Refining Company
Compressor Replacement Project |
Completed |
| 9 |
SICCI SALDO Contracting Nigeria Limited |
Ekulama – Awoba Pipeline Route Corridor Assessment Studies |
Completed |
| 10 |
PESO / NNPC Exploration & Production Limited (NEPL) |
OML 111 Feasibility Studies and FEED for flow flexibility |
Completed |
| 11 |
PESO / Enageed Resources Limited |
Conceptual Studies, FEED and DED For Retrofitting Installation of Thermal Heater Treater OML 148 |
Completed |
| 12 |
Platform Petroleum |
Supply and delivery of Production and operation spare parts |
Completed |
| 13 |
PESO / NNPC Exploration & Production Limited (NEPL) |
Feasibility Studies for OML 65 Facilities Optimization |
Completed |
| 14 |
PESO Energy Limited / Newcross E&P |
Engineering Design For The Installation for Inlet Coalescer Filter (F-100) |
Completed |
| 15 |
PESO Energy Limited / SALBERG Infrastructure |
ECost Engineering Services for A1GP Project |
Completed |
| 16 |
Lekki freeport Terminal |
EPC for the Installation of Metering Skid |
Completed |
| 17 |
PESO / Greeville LNG Ltd |
Interface Engineering Design for Nitrogen Plant for Greenville LNG |
Completed |
| 18 |
Stratus Trading Limited |
Front End Engineering Design for Bunker Facility (Tank Farm) Project |
Completed |
| 19 |
Marie Tecnimont |
Engineering Design, Fabrication, and Supply of 16 No. Orifice Plates for Area 5 Portharcourt Refining Company |
Completed |
| 20 |
BOKAR Engineering Limited |
Feasibility Studies for Gas Commercialization – Ammonia plant |
Completed |
| 21 |
TSL Logistics |
Product storage tanks infrastructure development studies for Mali and Senegal Project |
Completed |