CMA CGM: Feasibility studies and FEED for a 12 MW photovoltaic plant at Lekki Deep Sea Port

12 MWThe CMA CGM Group is progressing with the development of a 12 MW photovoltaic plant at the Lekki Deep Sea Port. The company has secured the services of Alchris Energy to conduct the requisite feasibility studies and Front-End Engineering Design (FEED). The project aims to supply green electricity directly to the Lekki Freeport Terminal (LFT) grid to decarbonize operations and provide a sustainable power source for its activities

More Images