Newcross Exploration & Production Limited has commissioned Alcris Energy to conduct conceptual studies, feasibility studies, and Front-End Engineering Design (FEED) for a new 250 MMSCFD Non-Associated Gas (NAG) processing plant in the Awoba field (OML 24). The project scope includes the design of a complete gas processing facility, an integrated LPG extraction plant, and a full fractionation unit, along with all necessary ancillary infrastructure.
This comprehensive initiative is aimed at defining the technical and commercial viability of the project, selecting the optimal development concept, and delivering the detailed engineering design required to commercialize Nigeria’s domestic gas resources, support the national drive for increased gas utilization, and reduce flaring